Galvanized / Pre-Galvanized Conduit Steel Pipe

Type: Welded
Technique: ERW
Material: Carbon Steel
Surface Treatment: Galvanized
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration
Transport Package: in Bundle
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
DN15-DN200
Trademark
TYT
Origin
China
HS Code
7306309000
Production Capacity
6000ton/Month

Product Description

CONDUIT PIPEP
IMC(International Metal Conduit) / Dimensions and Weights Chart
(Standard: UL 1242 C80.6 WW-C-581)
 
Trade 
Size
 
Metric 
Designator
Nominal Outside Nominal Wall
Thickness
Approx.Wt. Per 100Ft. (30.5M) Qty.In Master Bundle
in. mm in. mm Ib. kg ft m
1/2 16 0.706 17.9 0.042 1.07 30 13.6 7000 2135
3/4 21 0.922 23.4 0.049 1.25 46 20.9 5000 1525
1 27 1.163 39.5 0.057 1.45 67 30.4 3000 915
1 1/4 35 1.51 38.4 0.065 1.65 101 45.8 2000 610
1 1/2 41 1.74 44.2 0.065 1.65 116 52.6 1500 457.5
2 53 2.197 55.8 0.065 1.65 148 67.1 1200 366
2 1/ 2 63 2.875 73 0.072 1.83 216 98 610 186.1
3 78 3.5 88.9 0.072 1.83 263 119.3 510 155.6
3 1/2 91 4 101.6 0.083 2.11 249 158.3 370 112.9
4 103 4.5 114.3 0.083 2.11 393 178.2 300 91.5
Company Profile
Galvanized / Pre-Galvanized Conduit Steel PipeGalvanized / Pre-Galvanized Conduit Steel PipeQuality Inspection
Galvanized / Pre-Galvanized Conduit Steel PipeGalvanized / Pre-Galvanized Conduit Steel PipePackaging & Shipping
1.Port: TIANJIN
2.Payment Terms: L/C,T/T
3.Delivery: 15-45 days after deposit or according to customers' quantity.
4.Packing: 1.Big OD: in bulk  2.Small OD: packed by steel strips  3.woven cloth with 7 slats
                4.plastic bags  5.as per customer's option 
Our Services 
1.Customization is avaliable according to requirements.
2.All production processes are strictly under ISO 9001-2008.
3.Free sample ( not contain the cost of freight).
4.Third party inspection (SGS,BV...) is welcomed.
5.Visit factory any time.
6.FOB/ CIF/ CFR/ ERW is accepted. 




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now