Customization: | Available |
---|---|
Type: | Welded |
Technique: | ERW |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Packaging & Shipping
Transportation and Delivery
We have professional shipping agent for all the transportation of our products. Products will be packed in bags,box,or in other way as discussed, then in container. Products will be transported from factory to shipping port by truck. Finally it will be loaded on ship to destination.
You will be able to track the shipment in any time.
Packaging:Detail:normal export packing
Port:Tianjin
2. Lead Time
Within 15-20 working days after receipt the down payment
3. Usage industry: Structure, Motorbike and Automobile, Ornamental, medical equipment, Sport equipment and Home Furniture.
4. For pipes :
1. by bundles, each bundle weight under 3 tons, for small outer diameter seamless steel pipe, each bundle with 4 - 8 steel strips.
2. after making by bundle, covered with Polyethylene waterproof cloth.
3. make black paints painting or as discussed on each pipe, then make bundle
5. Delivery time: Within 15-20 working days after receipt the down payment.
Application: Mainly used in Construction, machinery manufacturing, iron and steel construction projects, shipbuilding, solar power support, steel structure engineering, power engineering, power plant, agriculture and chemical machinery, glass curtain wall, automobile chassis, airport, etc.