• ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
  • ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
  • ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
  • ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
  • ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
  • ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe

ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe

Type: Welded
Technique: ERW
Material: Carbon Steel
Surface Treatment: Black
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Mining, Special Purpose
Section Shape: Round/Square/Rectangle
Samples:
US$ 1/Meter 1 Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Delivery Time
25-30days
Grade
Q195,Q235,Q345
Surface
Surface
Transport Package
Export in Bundle
Specification
As customers′ request
Trademark
TYT(tianyingtai)
Origin
China
HS Code
7306309000
Production Capacity
500000 Ton / Year

Product Description

ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe
 Shape: Round/Square/rectangel
 OD:  1/2'-4'  13*13-100*100 10*20-50*100
 Wall thickness:  0.5-2.5mm
 length: 4-10m     (as customers' request)
Surface: Oiled/Painted , can be dealed as customers'need
Material: Q195/Q215/Q235
Standard: ASTM-A53   /BS 1387-1985/   GB/T 3091-2001 for round pipe
 Manufacturing Technique Weld/Seamless, ERW/SSAW/LSAW, Cold Drawn/Hot Drawn
 Ends: Plain /Beveled/ Threaded with sockets coupling and plastic caps/ Necking down/ Expanding neck/ Punching holes
Product show
ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe

About us
ASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel PipeASTM A53 Schedule 40 Black Metallic Carbon Tube/Pipe Steel Pipe FAQ                                                 
Q1:What about the quality?
  A:Third party inspections are always welcomed.as part of our dedication to the industry, we do
make arrangements for such inspections-ABS,DNV,BV,ect.
Q2: How long is your delivery time?
  A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock,
it is according to quantity.
Q3:Do you provide samples ? is it free or extra ?
  A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: How can I get a sample to check your quality? How long can I get the sample?
  A:After price confirmed, FREE SAMPLE could be provided for your evaluation. After you confirm the
sample details, the samples will be ready for delivery in 3-7 days, and will be sent to you via express
and arrive in 3-5 days.
Q5:May I customize the steel pipe?
  A:Yes, you can, we can manufacture according to your requirement, you can send the CAD or
design drawing to us.
Q6:Any Value-added Services?
  A:Fottunately for you,we are very experience in this industry.we have equipped our warehouse
with the necessities to perform in-house painting,coating,and pipe cutting.
Q7: How about the trade terms?
  A: EXW, FOB, CFR, CIF will be accepted.  


Contact Information

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now